Peer Review Projects

ALEXANDRIA ANIMAL CLINIC
ALEXANDRIA, VIRGINIA
Square Footage: 20,000
Prepared mechanical systems design narrative for new two-story animal clinic with enclosed parking garage beneath. Provided review with written comments on final construction documents prepared by others.
IMS Client: Wunk Spurlock Architects

BENSON-HEAD RESIDENCE
DENVER, COLORADO
Reviewed design-build mechanical system construction documents for design intent and compliance with HVAC load calculations.
IMS Client: Sun Design Concepts

CESSNA C-1O SERVICE CENTER
WICHITA, KANSAS
Square Footage: 500,000
Reviewed mechanical construction documents and prepared written report.
IMS Client: Tectonic Management Group

DASSAULT FALCON
WILMINGTON, DELAWARE
Square Footage:   89,255
Reviewed mechanical construction documents and prepared written report.
IMS Client:  Tectonic Management Group

DOUGLAS COUNTY EVENTS CENTER
CASTLE ROCK, COLORADO
Square Footage: 29,000
Reviewed 100% complete mechanical construction documents and prepared written report addressing design intent and code compliance.
IMS Client: Pahl, Pahl, Pahl Architects

HILL HALL (Colorado School of Mines)
GOLDEN, COLORADO
Reviewed mechanical construction documents and load calculations for 107,000 square foot building remodel including geotechnical laboratory and test facilities.
IMS Client: RNL Design

LONG LAKE RESTROOM/CONCESSION BUILDING
ARVADA, COLORADO
Square Footage: 1,422
Performed thorough review of mechanical construction documents at 50% and 100% completion levels, with written comments and red lines to Engineer of Record. Performed final site observations with report for third party review upon constructed design-build project.
IMS Client: City of Arvada

MOUNTAIN THUNDER
BRECKENRIDGE, COLORADO
Square Footage: 130,406
Performed review of construction documents at 50% and 100% completion levels, with written comments to design team.
IMS Client: Vail Resorts and Development

RITZ CARLTON
VAIL, COLORADO
Square Footage: 200,000
Performed review of construction documents at 50% and 100% completion levels, with written comments to design team. Met with design team on multiple occasions to review design philosophy and code compliance ramifications.
IMS Client: Vail resorts and Development

SOLARIS
VAIL, COLORADO
Square Footage: 547,000
Performed review of construction documents at eight different stages of completion. Generated list of comments, updated as issues were resolved during design development. Met with design team and ownership group on multiple occasions to review design intent and code compliance ramifications.
IMS Client: Solaris Development

STEELWORKS MUSEUM
PUEBLO, COLORADO
Square Footage: 50,000
Performed review of contract documents for historic structure HVAC, plumbing and fire protection renovation. Worked with Engineer of Record to finalize the documents previously prepared by Integrated Mechanical Systems under separate contract.
IMS Client: Maxson Engineering

QUIZNOS RESTAURANT
DENVER, COLORADO
Performed review of construction documents for grade level restaurant with Type II hood design and supplemental cooling system in high rise office tower.
IMS Client: Institutional Realty

WESTMINSTER FIRE DEPARTMENT
WESTMINSTER, COLORADO
Square Footage: 15,000
Performed review of 95% complete construction documents completed by others for code compliance and suitability of design.
IMS Client: City of Westminster

WESTMINSTER LIBRARY
WESTMINSTER, COLORADO
Performed review of 95% complete construction documents completed by others for code compliance and suitability of design.
IMS Client: City of Westminster

WESTMINSTER PUBLIC SAFETY CENTER
WESTMINSTER, COLORADO
Square Footage: 76,174
Performed review of 90% complete construction documents completed by others for code compliance and suitability of design.
IMS Client: City of Westminster