School Experience

AEROSPACE ENGINEERING CENTER DATA CENTER (University of Colorado)
BOULDER, COLORADO
Square Footage: 800
Supplemental CRAC unit design and construction documents
IMS Client: University of Colorado
Year Completed: 2004

ALEXANDER DAWSON SCHOOL, CLASSROOM COTTAGE REMODEL
LAFAYETTE, COLORADO
Square Footage: 20,100
– Mechanical system replacement
– Gas fired residential style furnaces with dx cooling
IMS Client: Expert Mechanical Services, Inc.
Year Completed: 1999

ALEXANDER DAWSON SCHOOL, HENDERSON HALL REMODEL
LAFAYETTE, COLORADO
Square Footage: 49,451
– Conversion of private school dormitory building into classroom use
– Chilled water/heating water retrofit
– Plumbing/chemical waste system
IMS Client: Expert Mechanical Services, Inc.
Year Completed: 1999

ARTS BUILDING MECHANICAL DUE DILIGENCE (Auraria Higher Education Center)
DENVER, COLORADO
Square Footage: 123,000
Mechanical Due Diligence
Written Report with Recommended Improvements
IMS Client: Eric Bartczak Architect
Year Completed: 2009

ARTS BUILDING MECHANICAL REMODEL (Auraria Higher Education Center)
DENVER, COLORADO
Square Footage: 123,000 s.f.
HVAC and plumbing remodel with new VAV system and controls
Wood, metal and ceramics shop ventilation
Heat recovery system for steam system cooling system
IMS Client: Eric Bartczak Architect
Year Completed: 2012

BUENA VISTA MIDDLE SCHOOL (Buena Vista School District)
BUENA VISTA, COLORADO
Square Footage: 30,000
– HVAC consultation regarding radon mitigation
IMS Client: Buena Vista Schools
Year Completed: 1991

BUTLER HANCOCK STUDENT RECREATION CENTER CONSULTING (University of Northern Colorado)
GREELEY, COLORADO
Natural ventilation system analysis and written report.
IMS Client: University of Northern Colorado
Year completed: 2009

CENTRAL HIGH SCHOOL (Aurora Public Schools)
AURORA, COLORADO
Square Footage: 4,320
New mobile classroom utility design
IMS Client: Aurora Public Schools
Year Completed: 2005

CENTRAL LAKEWOOD SCHOOL (Jefferson County Schools)
LAKEWOOD, COLORADO
Square Footage: 28,825
– Schematic mechanical system replacement design
– Historic vintage building
IMS Client: Bennett Wagner & Grody
Year Completed: 1995

CHEYENNE WELLS MIDDLE SCHOOL (Cheyenne Wells School District)
CHEYENE WELLS, COLORADO Square Footage: 33,000
– New hot water baseboard heating system replacement for the existing radiation system
– New classroom and corridor ventilation
IMS Client: Architecture Plus, Kansas
Year Completed: 1995

COMMUNITY COLLEGE OF DENVER
DENVER, COLORADO
Square Footage: 37,000
– HVAC and plumbing renovation of existing commercial office building
– Commercial kitchen
– Rated corridors
IMS Client: Intergroup Architects
Year Completed: 1992

CROWLEY COUNTY DUE DILIGENCE (Crowley County School District)
ORDWAY, COLORADO
Square Footage: 5 Buildings
HVAC, Plumbing and fire protection due diligence
5 buildings that comprise entire school district
Comprehensive report
IMS Client; Andrews & Anderson, Architects
Year Completed: 2008

DALTON ELEMENTARY (Aurora Public Schools)
AURORA, COLORADO
Square Footage: 2,000
Building Heating Boiler Replacement
IMS Client: Aurora Public Schools
Year Completed: 2005

DENNISON ELEMENTARY SCHOOL (Denver Public Schools)
DENVER, COLORADO
Square Footage: 3,600
– Mechanical systems remodel
– Kitchen exhaust and make up air design
IMS Client: Bennett Wagner & Grody
Year Completed: 1996

FARRAND HALL REFRIGERANT SYSTEM UPGRADE (University of Colorado)
BOULDER, COLORADO
Square Footage: 8,400
Mechanical Due Diligence
HVAC Load Study
IMS Client: University of Colorado
Year Completed: 2004

FINE ARTS BUILDING (University of Colorado)
BOULDER, COLORADO
Square Footage: 4,830
Mechanical system survey
Recommendations for HVAC system improvements for fine arts hall
IMS Client: University of Colorado
Year Completed: 2002

FISKE PLANETARIUM CONSULTING (University of Colorado)
BOULDER, COLORADO
Square Footage: 13,688
Mechanical site survey
Recommendations for HVAC system improvements
IMS Client: University of Colorado
Year Completed: 2003

FORT LOGAN ELEMENTARY (Sheridan Public Schools)
SHERIDAN, COLORADO
Square Footage: 12,800
– New boiler replacement
– Rework steam piping and heat distribution side of existing facility
– Replace hot water piping and heat distribution side of existing facility
IMS Client: LDW Associates
Year Completed: 1989

FORT MORGAN COMMUNITY COLLEGE
FORT MORGAN, COLORADO
Square Footage: 12,000
– Total HVAC and plumbing renovation
– Historic nature of building offered unique challenge
IMS Client: Bley Associates Architects
Year Completed: 1992

FULTON ELEMENTARY (Aurora Public Schools)
AURORA, COLORADO
Square Footage: 56,000
HVAC and plumbing remodel for entire school
Boiler replacement
6 classroom addition
Kitchen addition
IMS Client: Barker Rinker Seacat
Year Completed: 2004

FULTON ELEMENTARY MOBILE RELOCATION (Aurora Public Schools)
AURORA, COLORADO
Square Footage: 4,800
HVAC replacement
Relocated two mobile units to new schools locations
Gas piping design
IMS Client: Aurora Public Schools
Year Completed: 2004

GATEWAY HIGH SCHOOL BOILER REPLACEMENT (Aurora Public Schools)
AURORA, COLORADO
Steam heating boiler replacement design for main building boiler with heat exchangers serving main domestic hot water heating boiler and swimming pool heating boiler
Mechanical survey of multiple mechanical rooms
IMS Client: Aurora Public Schools
Year Completed: 2005

HALLET HALL ADMINISTRATIVE OFFICES (University of Colorado)
BOULDER, COLORADO
Square Footage: 20,000
Mechanical survey to establish existing conditions
Recommendations for HVAC improvements
IMS Client: University of Colorado
Year Completed: 2003

HILL HALL RENOVATION PEER REVIEW (Colorado School of Mines)
GOLDEN, COLORADO
Square Footage: 107,000
Peer review of HVAC, plumbing and fire protection design and construction documents
Variable air volume laboratory and fume hood exhaust systems
IMS Client: RNL Design
Year Completed: 1996

INSTITUTE OF BEHAVIORAL GENETICS LABORATORY (University of Colorado)
BOULDER, COLORADO
Square Footage: 2,800
– 2nd story addition to existing laboratory/research building
– Relocated air cooled chiller in occupied building
– HVAC, plumbing
IMS Client: Coover-Clark & Associates
Year Completed: 1999

JOHNSON ELEMENTARY (Denver Public Schools)
DENVER, COLORADO
Square Footage: 55,000
– Upgrade lawnsprinkler cross contamination control
– Remodel girls’ & boys’ restrooms
– Replace steam condensate retrieval system
– Rebuild steam control valve & traps throughout building
IMS Client: Abo Copeland Architects
Year Completed: 1991

KELLY WALSH HIGH SCHOOL (Natrona County School District)
LARAMIE, WYOMING
Square Footage: 80,000
– Asbestos abatement and forensic analysis project
– Expert witness and HVAC consultation
IMS Client: McKenzie & McPhail
Year Completed: 1990

KENT DENVER SCHOOL, COMMONS AREA
CHERRY HILLS, COLORADO
Square Footage: 4,600
-HVAC system replacement and upgrade
IMS Client: Kent Denver School
Year Completed: 2002

KENT DENVER SCHOOL, GATES SCIENCE BUILDING
CHERRY HILLS, COLORADO
Square Footage: 13,150
– Due diligence evaluation of existing plumbing and HVAC system
IMS Client: Hutton Ford Architects
Year Completed: 1999

KENT DENVER SCHOOL, GATES SCIENCE BUILDING
CHERRY HILLS, COLORADO
Square Footage: 27,600
-HVAC system replacement and addition
-Plumbing system remodel and addition
-New fire sprinkler system
-Complete due diligence and mechanical site survey of existing building
IMS Client: Hutton Ford Architects
Year Completed: 2001

KENTON ELEMENTARY (Aurora Public Schools)
AURORA, COLORADO
Square Footage: 1,500
Building Heating Boiler Replacement
IMS Client: Aurora Public Schools
Year Completed: 2004

KITTRIDGE COMMONS CONSULTING (University of Colorado)
BOULDER, COLORADO
Square Footage: 15,000
Analysis into cause of water infiltration into basement level mechanical room
IMS Client: University of Colorado
Year Completed: 2002

KITTRIDGE WEST CONSULTING (University of Colorado)
BOULDER, COLORADO
Water heater replacement and construction documents
IMS Client: University of Colorado
Year Completed: 2003

LASP/LSTR SUPPLEMENTAL DATA CENTER COOLING (University of Colorado)
BOULDER, COLORADO
Square Footage: 4,500
CRAC unit design and construction documents.
IMS Client: University of Colorado
Year Completed: 2005

LAWRENCE ELEMENTARY SCHOOL (Jefferson County Schools)
ARVADA, COLORADO
Square Footage: 53,000
– Feasibility study to evaluate new school vs. remodel/addition
IMS Client: Pahl, Pahl, Pahl
Year Completed: 1994

MAPLEGROVE ELEMENTARY (Jefferson County Schools)
GOLDEN, COLORADO
Square Footage: 3,500
– 2,500 s.f. library addition
– Plumbing, HVAC system design
– Renovation of computer lab and existing library room
IMS Client: Havecost & Associates
Year Completed: 1995

MARINE COURT HYDRONIC HEATING SYSTEM (University of Colorado)
BOULDER, COLORADO
Square Footage: Yard system for multiple buildings
Hydronic supply and return heating system replacement
Boiler room site survey with improvement design for pumping and air control
IMS Client: University of Colorado
Year Completed: 2004

MITCHELL ELEMENTARY SCHOOL (Denver Public Schools)
DENVER, COLORADO
Square Footage: 11,330
– Mechanical systems remodel
– Classroom remodel
IMS Client: Bennett Wagner & Grody
Year Completed: 1996

MONTESSORI SCHOOL REMODEL
DENVER, COLORADO
Square Footage: 14,000
– Mechanical systems retrofit
– New kitchen retrofit design
IMS Client: Murphy Design Group
Year Completed 1995

MOREY MIDDLE SCHOOL (Denver Public Schools)
DENVER, COLORADO
Square Footage: 5,000
Air Handling Unit Refurbishment
Temperature Controls Upgrade
Control Damper Replacement
Steam Coil Replacement
IMS Client: Denver Public Schools
Year Completed: 2004

MORGAN LIBRARY RENOVATION/ADDITION (Colorado State University)
FORT COLLINS, COLORADO
Square Footage: 150,000 remodel
120,000 addition
– Plumbing system, ADA remodel and addition
– Fire protection system design including head lay-out, standpipe, pre-action and dry pipe loading dock fire sprinkling
IMS Client: LOA Architects
Year Completed: 1997

MUNROE ELEMENTARY (Denver Public Schools)
DENVER, COLORADO
Square Footage: 39,000
– Lawn sprinkler cross connection control & layout
IMS Client: Abo Copeland Architects
Year Completed: 1991

PICKENS TECH BUILDING C & BUILDING D (Aurora Public Schools)
AURORA, COLORADO
Square Footage: 8,400
Mechanical Due Diligence and HVAC Load Study
IMS Client: Aurora Public Schools
Year Completed: 2004

RANGEVIEW HIGH SCHOOL (Aurora Public Schools)
AURORA, COLORADO
Square Footage; 4,320
New mobile classroom utility design
IMS Client: Aurora Public Schools
Year Completed: 2005

RL6 AIR HANDLING SYSTEM UPGRADES (University of Colorado)
BOULDER, COLORADO
Square Footage: 44,697
Replace air handling systems
Construction documents
IMS Client: University of Colorado
Year Completed: 2006

SCHENCK ELEMENTARY (Denver Public Schools)
Square Footage: 41,000
– Upgrade lawnsprinkler cross contamination control
– Kitchen hood upgrade
IMS Client: Abo Copeland Architects
Year Completed: 1991

SCHMITT ELEMENTARY (Denver Public Schools)
DENVER, COLORADO
Square Footage: 47,000
– Upgrade lawnsprinkler cross contamination control & irrigation layout
– Remodel girls’ & boys’ restrooms
– Rebuild steam control valves & traps throughout building
IMS Client: Abo Copeland Architects
Year Completed: 1991

SOUTH MIDDLE SCHOOL (Aurora Public Schools)
AURORA, COLORADO
Square Footage: 8,217
– Mechanical systems remodel
– Life cycle cost analysis
– Gas piping design for multi building complex
– Computer room air conditioner
IMS Client: TSP Five, Inc.
Year Completed: 1997

SWANSEA ELEMENTARY (Denver Public Schools)
DENVER, COLORADO
Square Footage: 5,440
2 (4) classroom addition
HVAC and plumbing addition
IMS Client: LOA Architects
Year Completed: 2003

TOLLGATE ELEMENTARY (Aurora Public Schools)
AURORA, COLORADO
Square Footage: 2,000
Heating pumps replacement
IMS Client: Aurora Public Schools
Year Completed: 2005

UNIVERSITY APARTMENTS HYDRONIC PIPING (University of Northern Colorado)
GREELEY, COLORADO
Square Footage: Yard piping design for 7 building complex
Heating water supply and return
Revised direct return system with reverse return installation strategy
Mechanical survey of existing boiler room and piping system
IMS Client: University of Northern Colorado
Year Completed: 2009

UNIVERSITY CENTER FLAT PLATE ECONOMIZER STUDY(University of Northern Colorado)
GREELEY, COLORADO
Heat recovery/energy cost basis analysis for chiller flat plate system
IMS Client; University of Northern Colorado
Year Completed: 2008

UNIVERSITY OF PHOENIX BUILDING RENOVATION
GREENWOOD VILLAGE, COLORADO
Square Footage: 32,000
– Modify HVAC following thorough existing mechanical conditions survey
– New classrooms, change of use, change of occupancy of building
– Tenant improvement including new ADA toilets
– New 1 hour rated corridors
– New pre-action fire sprinkler system design
IMS Client: David Budrow Architects
Year Completed: 1992

UNIVERSITY TECHNOLOGY CENTER (University of Denver)
DENVER, COLORADO
Square Footage: 7,500
Two-story addition to existing building
Data center with multiple CRAC units
IMS Client: Andrews & Anderson, Architects
Year Completed: 2008

VAUGHN ELEMENTARY (Aurora Public Schools)
AURORA, COLORADO
Square Footage: 2,000
Building Heating Boiler Replacement
IMS Client: Aurora Public Schools
Year Completed: 2005

WARDER ELEMENTARY (Jefferson County Schools)
LAKEWOOD, COLORADO
Square Footage: 38,000
– Remodel entire school for new HVAC zoning to eliminate “open-space” format
– Plumbing remodel design
IMS Client: Alber Engineering
Year Completed: 1988